This Tuesday April 14 · 7 PM — Township Committee Meeting · Tell your elected officials to introduce a data center ban ordinance NOW, before April 21.
What to do at April 14 →
Stop the Data Center — Mount Royal, NJ

Protect East Greenwich, NJ

American Tower Corporation wants to build a 4-megawatt industrial data facility 50 feet from your back windows — in a residential zone. Two critical meetings are coming: the Township Committee on April 14 and the Planning Board hearing on April 21. Both matter. Your voice matters.

SHOW UP: April 14 — Committee Meeting ↓ SHOW UP: April 21 — Stop the Approval ↓ See the Problems Source Documents
Planning Board Hearing East Greenwich Township Municipal Building · 7:00 PM
Time remaining
-- days
-- hrs
-- min
-- sec
By the numbers — from ATC's own application
50 ft
Distance from the nearest townhouse windows on Acorn Drive to the property line
Source: ATC site plan, Sheet C-201
4 MW
Continuous power draw — equal to 3,000–4,000 homes running nonstop, every day
Source: Stantec noise assessment, March 2026
38
Pieces of outdoor mechanical equipment running 24 hours a day, 7 days a week, forever
Source: ATC equipment schedule, Table 1
5 of 9
Residential receptors projected at the maximum nighttime noise limit — with zero margin
Source: Stantec noise assessment, Table 2
+361%
Increase in hard surface coverage — from 7.4% to 34% — pouring runoff toward Mantua Creek
Source: ATC site data table, Sheet G-001
2017
Year ATC secretly began planning this. They labeled it a "securitization" — a financial asset
Source: Phase I ESA, Advantage Engineers, Oct. 2017
$0
Amount of water consumption data provided to the board — despite a direct tap to our municipal water
Source: ATC application — field left blank
R-10
The residential zoning designation. Data centers are not permitted here. ATC needs a variance.
Source: East Greenwich Township Municipal Code
What's wrong with this application

Six reasons this
shouldn't be approved

01 / WETLANDS
Active state wetland review — unresolved
ATC's own 2017 environmental assessment said no wetlands. Their 2026 site plan shows a "50-foot wetland transition buffer, pending NJDEP verification." The state review is still open. The board has no business approving this until NJDEP resolves it.
NJDEP Review #0803-25-002.1 Open
02 / FLOOD ZONE
FEMA floodway on the property — no permit shown
The 2017 Phase I said not in a flood zone. The 2026 site plans show FEMA Zone AE — the highest flood risk designation — on the rear of the property along Mantua Creek. Any work in Zone AE requires a NJDEP Flood Hazard Area permit. None is in the application.
FEMA Zone AE — Permit Required
03 / NOISE
Zero margin at five homes — based on the applicant's own data
ATC's noise study — done entirely by software, no field measurements — shows five of nine nearby homes already at the legal maximum nighttime noise limit. Any equipment change, degradation over time, or atmospheric variation puts this facility in violation on day one.
No Ambient Baseline Measured
04 / WATER
Direct tap to our water system — zero consumption data
The application confirms a direct wet tap to East Greenwich Public Works' municipal water supply for cooling. The water consumption field was left completely blank. The board cannot evaluate the impact on our water system without this data. Similar facilities use millions of gallons per year.
Water Data: Not Provided
05 / ENVIRONMENTAL
No environmental impact statement — field marked "N/A"
For a project that adds 70,823 square feet of hard surface, sits next to a regulated floodway, borders Mantua Creek, and has five diesel generators near a children's playground, ATC checked "not applicable" on the environmental impact statement. This is not acceptable.
EIS: Marked Not Applicable
06 / ZONING
It's not permitted here — and ATC can't prove it should be
To get a D variance, ATC must prove two things: special reasons the use should be here, and that it won't harm the neighborhood. They haven't proven either. The burden is entirely on them. This is a residential community. The zone plan says so.
D Variance: High Legal Bar
How we got here

A Decade in Secret

1965

Tower Built

Cell tower constructed on the property. Serves telecommunications carriers.

2006

Neighborhood Grows

Oak Ridge, Weathervane Farms, and surrounding residential communities develop around the site.

2008

Tower Variance Approved

Board told: no noise, no water demand, no municipal services. They approved the tower use — not a data center.

Oct 2017

ATC Begins Secret Planning

ATC commissions a Phase I Environmental Site Assessment labeled "Securitization." They are packaging this property as a data center asset — while the community has no idea.

Feb 2026

Preliminary Plans Drawn

ATC submits site plans dated February 2, 2026. All drawings stamped "Preliminary: Not for Construction."

Mar 2026

Noise Study Completed

Stantec produces a desktop noise assessment using software only — no field measurements ever taken at the site.

Apr 21

YOUR CHANCE TO STOP IT

East Greenwich Planning & Zoning Board hearing, 7 PM. This is Case 2026-1 — the first time the board will hear this application. Show up.

Two Meetings. Both Matter.

APR
14
Township Committee Meeting — Your Elected Officials
Tuesday, April 14 · 7:00 PM · 159 Democrat Road, Mickleton
This is not the zoning hearing — it's your elected Township Committee. They cannot stop the April 21 vote, but they can introduce a protective ordinance and send a public signal. Monroe Township's council did exactly this and it worked. Come and put them on record.
01

Demand a Ban Ordinance

Speak during public comment. Ask the committee to introduce an ordinance explicitly prohibiting data centers in residential zones — just like Monroe Township did. State your name, address, and your ask clearly. You have 5 minutes.

02

Put Them on Record

Ask each committee member directly: do you support or oppose this data center? Their answer — or their silence — tells you everything. This is a public meeting and everything is on the record.

03

Show Up Even If You Don't Speak

Numbers matter. A packed room tells elected officials their constituents are watching. Bring neighbors. You don't have to speak to make an impact — just be there.

APR
21
Planning & Zoning Board Hearing — The Real Vote
Tuesday, April 21 · 7:00 PM · 159 Democrat Road, Mickleton · Case 2026-1
This is where it is decided. The Planning Board will hear ATC's application for a D variance to build an industrial data facility in a residential zone. The burden of proof is entirely on ATC — they must prove the variance should be granted. The board stops taking new testimony at 11 PM. Pack the room early.
01

Fill the Room

Arrive before 7 PM. Bring neighbors, family, anyone who lives in East Greenwich. A packed room signals to the board that this community is watching. You do not have to speak — presence alone matters.

02

Speak During Public Comment

You have 5 minutes. State your name and address. Focus on one specific concern — noise with zero margin, no water data, unresolved wetlands, FEMA floodway. Be factual. You can also question ATC's expert witnesses after their testimony.

03

Write to the Board Before April 21

Send written comments to Land Use Secretary Stephanie McCaffrey at smccaffrey@eastgreenwichnj.com or call 856-423-0654 ext. 8102. Written comments become part of the public record.

04

Contact Your State Rep

Assemblyman David Bailey Jr. sponsored NJ's 2026 data center legislation. His district covers this area. Contact his office and tell him a data center is being proposed in a residential neighborhood in his backyard.

05

Share This Page

Every neighbor who shows up matters. Share this on Facebook, Nextdoor, and WhatsApp — Oak Ridge, Weathervane Farms, anyone in East Greenwich. The more people in that room on April 21, the harder it is to approve.

April 21 Hearing Details

Date Tuesday, April 21, 2026
Time 7:00 PM
Location East Greenwich Township Municipal Building
Address 159 Democrat Road, Mickleton, NJ 08056
Case No. 2026-1 — American Tower Corporation
Note Board stops new testimony at 11 PM — arrive early
Take action right now

Write to the People
Who Can Act

Fill in your name and address, then copy and send. Every letter becomes part of the public record. Don't skip the [NAME] and [ADDRESS] fields — officials take letters from named constituents far more seriously than anonymous ones.

For the Planning Board - pick one. If you're short on time, send the quick one. If you want your letter to carry more weight, send the full case.

Send to
Stephanie McCaffrey, Land Use Secretary
smccaffrey@eastgreenwichnj.com
CC: emcgill@eastgreenwichnj.com
When to send: Before April 21. This goes into the official hearing record. Short and personal is fine — they count every letter.
Subject: Opposition to Application 2026-1 — American Tower Corporation, 114 Mantua Road Dear Members of the East Greenwich Planning and Zoning Board, My name is [YOUR NAME] and I am a resident of East Greenwich Township at [YOUR ADDRESS]. I am writing to oppose Application 2026-1, submitted by American Tower Corporation for a data storage facility at 114 Mantua Road in Mount Royal. This is a residential neighborhood. A 4-megawatt industrial data facility does not belong here, and I urge the board to deny the D variance request. I will be attending the April 21 hearing and ask that my opposition be entered into the public record. Respectfully, [YOUR NAME] [YOUR ADDRESS] [YOUR PHONE OR EMAIL]
Open in Email App
Send to
Stephanie McCaffrey, Land Use Secretary
smccaffrey@eastgreenwichnj.com
CC: emcgill@eastgreenwichnj.com
When to send: Before April 21. Use this if you want to make a substantive case on the record. References ATC's own documents.
Subject: Opposition to Application 2026-1 — American Tower Corporation, 114 Mantua Road Dear Members of the East Greenwich Planning and Zoning Board, My name is [YOUR NAME] and I reside at [YOUR ADDRESS] in East Greenwich Township. I am writing in opposition to Application 2026-1 and to request that the board table this application until it is materially complete. Reviewing ATC's own submitted documents, I have identified the following deficiencies that must be resolved before any vote: UNRESOLVED WETLANDS: ATC's site plans acknowledge an active NJDEP wetland delineation review on this property (Program Interest ID 0803-25-002.1). The board should not approve a 4.5-acre grading project while the state's wetland boundary determination is still pending. NO WATER CONSUMPTION DATA: The application confirms a direct wet tap to East Greenwich's municipal water supply for cooling — yet provides zero water consumption projections. The board cannot evaluate the impact on our water system without this information. ZERO NOISE MARGIN AT FIVE HOMES: ATC's own noise assessment, based on software modeling with no field measurements, shows five of nine nearby residences already at the maximum legal nighttime noise limit. There is no margin for error. NO ENVIRONMENTAL IMPACT STATEMENT: For a project that increases impervious surface by 70,823 square feet adjacent to a FEMA floodway and Mantua Creek, ATC marked the environmental impact statement field "not applicable." This application does not meet the standard for a D variance. ATC has not demonstrated the special reasons required by the Municipal Land Use Law, nor shown the variance can be granted without substantial detriment to this residential community. I respectfully ask the board to deny this application, or at minimum table it until the above deficiencies are resolved. I will be attending the April 21 hearing. Respectfully, [YOUR NAME] [YOUR ADDRESS] [YOUR PHONE OR EMAIL]
Open in Email App
Send to — all five members
Mayor James Philbin: jphilbin@eastgreenwichnj.com
Deputy Mayor Richard Schober: rschober@eastgreenwichnj.com
Committeewoman Eileen Hollingshead: ehollingshead@eastgreenwichnj.com
Committeeman Robert Tice: rtice@eastgreenwichnj.com
Committeeman Michael Quigley: mquigley@eastgreenwichnj.com
When to send: Before April 14. Note: Mayor Philbin and Deputy Mayor Schober also sit on the Planning Board that votes April 21 — they need to hear from you on both fronts.
Subject: Request to Introduce Data Center Ban Ordinance — April 14 Meeting Dear Members of the East Greenwich Township Committee, My name is [YOUR NAME] and I live at [YOUR ADDRESS] in East Greenwich Township. I am writing ahead of the April 14 committee meeting to ask you to act. American Tower Corporation has applied to build a 4-megawatt data storage facility at 114 Mantua Road in Mount Royal — a residentially zoned neighborhood. The Planning and Zoning Board will hear this application on April 21. Before that hearing, I am asking this committee to introduce an ordinance that explicitly prohibits data centers as a permitted or conditional use in East Greenwich's residential zones. This is not unprecedented. Monroe Township, also in Gloucester County, moved to do exactly this after residents organized and showed up. Their council introduced an ordinance to ban data centers township-wide. East Greenwich should do the same. Data centers are not a permitted use in R-10 under our current code — but that implicit protection is not enough. An explicit ordinance removes any ambiguity and protects every residential neighborhood in this township, not just Mount Royal. I will be at the April 14 meeting. I ask that you introduce this ordinance and that each member go on record about where they stand. Our neighborhood is watching. Respectfully, [YOUR NAME] [YOUR ADDRESS] [YOUR PHONE OR EMAIL]
Open in Email App
Send to — LD3 legislators
Senator John Burzichelli: senburzichelli@njleg.org
Assemblyman Dave Bailey Jr.: asmbailey@njleg.org
Assemblywoman Heather Simmons: aswsimmons@njleg.org
Office: 711 N. Main St, Glassboro · (856) 226-3530
Why this matters: Assemblyman Bailey sponsored NJ's March 2026 data center ratepayer protection bill. All three represent East Greenwich directly. They can use their platform and consider further legislation.
Subject: Data Center Proposed in Residential Neighborhood — East Greenwich Township Dear Senator Burzichelli, Assemblyman Bailey, and Assemblywoman Simmons, My name is [YOUR NAME] and I live at [YOUR ADDRESS] in East Greenwich Township, which you represent in the Third Legislative District. I am writing because American Tower Corporation has applied to build a 4-megawatt data storage facility at 114 Mantua Road in the Mount Royal section of our town — a residentially zoned neighborhood. The East Greenwich Planning and Zoning Board will hear this application on April 21, 2026. I know you are already engaged on this issue at the state level. Assemblyman Bailey sponsored the data center ratepayer protection bill that passed in March 2026. The problem is now at our doorstep. This application has serious deficiencies: a direct tap to our municipal water supply with zero consumption data provided; an active NJDEP wetland review that hasn't been resolved; a noise study showing five of nine nearby homes already at the legal maximum nighttime limit with no field measurements taken; and no environmental impact statement for a project next to a FEMA floodway and Mantua Creek. We are asking two things. First, make your voices heard publicly before April 21 — your constituents need to know where their state representatives stand. Second, consider whether state-level action is appropriate to give municipalities stronger tools to protect residential neighborhoods from inappropriate data center siting. The community will be at the April 21 hearing. We hope you will be paying attention. Respectfully, [YOUR NAME] [YOUR ADDRESS] [YOUR PHONE OR EMAIL]
Open in Email App
Primary source material

Read ATC's Own Documents

Every claim on this site comes directly from ATC's application. Read the originals yourself.

Site Plan Application
Major Site Plan — 114 Mantua Road
ATC Tower Services LLC · Filed February 10, 2026
Environmental Assessment
Phase I Environmental Site Assessment
Advantage Engineers LLC · October 19, 2017
Noise Assessment
Desktop Sound Assessment — Mount Royal Facility
Stantec Consulting Services · March 9, 2026